Pre-tender interview
When selecting suppliers to design, construct and perhaps operate a development, an initial short-list of prospective tenders may be invited to attend pre-tender interviews before they are invited to tender.
A pre-tender interview is an opportunity to:
- Assess the tenderers understanding of the commission.
- Assess the tenderers likely approach to the project.
- Assess the tenderers current workload.
- Assess the tenderers enthusiasm.
- Clarify ambiguities on either side.
- Verify that the proposed timescale for the tender process is achievable.
- Verify that the proposed nature of the tender process will obtain the best results.
Price does not feature in the pre-tender interviews as tender documents have yet to be issued.
Discussions held during the interviews may result in changes being made to the tender documents or to the length of the tender period. It can be in the interest of the client to make these changes as it ensures that they get the best value and most accurate tenders possible.
Interviews may include presentations by prospective tenderers, followed by questions from a small panel. The panel should agree in advance the nature of questions to be asked of each consultant (perhaps based on an assessment of their pre-qualification questionnaires). Answers may be scored and weighted, and sufficient time allowed between interviews for scores to be compiled and considered. This allows an objective appraisal to take place and also allows a consensus opinion to be formed, rather than having decisions driven by a single person.
Pre-tender interviews should be carefully managed so that tenderers are not made aware of who the other tenderers are, as this may impact on the competitiveness of the tenders they submit. This may include arrangements in relation to timing, car parking, waiting rooms and signing in books as well as the removal of any materials left by at the interviews by tenderers.
If the pre-tender interviews reveal that one or more prospective candidates are unsuitable, the initial shortlist may be reduced and the remaining candidates invited to tender.
It may also be appropriate to hold mid-tender interviews.
[edit] Related articles on Designing Buildings Wiki
- Best value.
- Construction contract.
- Contract documents.
- How to prepare tender documents.
- Mid-tender interviews.
- Pre-qualification questionnaire.
- Procurement route.
- Tender.
- Tender documents
- Tender negotiations.
- Tender settlement meeting.
[edit] External references
- PACE Guidance on the Appointment of Contractors and Consultants p 481 (for contractors) and p303 (for consultants).
- OGC Tendering process for consultancy support.
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
Construction Management, 2 June
Construction deaths halve in two years.
Green Book changes to drive investment in all parts of UK.
Minimum energy efficiency standards (MEES)
CIAT briefing on response to consultations for privately rented non-domestic properties.
Connect, collaborate, shape the future
Registration now live for UK Construction Week Birmingham.
CIOB announces Saul Humphrey FCIOB as new President for 26/27 term.
A quick, simple, and zero-bills solution to prevent overheating.
The adaptive reuse of large industrial structures.
Promoting the circular economy by extending the life of buildings.
CIAT responds to Climate Change Committee report
An urgent wake-up call for both government and the built environment.
Construction Management, 24 June
FMB pilot aims to build pipeline of site-ready tradespeople.
A quick introduction.
CLC publishes Mental Health Joint Code of Practice.
A quick introduction to its uses and risks.