Pre-tender interview
When selecting suppliers to design, construct and perhaps operate a development, an initial short-list of prospective tenders may be invited to attend pre-tender interviews before they are invited to tender.
A pre-tender interview is an opportunity to:
- Assess the tenderers understanding of the commission.
- Assess the tenderers likely approach to the project.
- Assess the tenderers current workload.
- Assess the tenderers enthusiasm.
- Clarify ambiguities on either side.
- Verify that the proposed timescale for the tender process is achievable.
- Verify that the proposed nature of the tender process will obtain the best results.
Price does not feature in the pre-tender interviews as tender documents have yet to be issued.
Discussions held during the interviews may result in changes being made to the tender documents or to the length of the tender period. It can be in the interest of the client to make these changes as it ensures that they get the best value and most accurate tenders possible.
Interviews may include presentations by prospective tenderers, followed by questions from a small panel. The panel should agree in advance the nature of questions to be asked of each consultant (perhaps based on an assessment of their pre-qualification questionnaires). Answers may be scored and weighted, and sufficient time allowed between interviews for scores to be compiled and considered. This allows an objective appraisal to take place and also allows a consensus opinion to be formed, rather than having decisions driven by a single person.
Pre-tender interviews should be carefully managed so that tenderers are not made aware of who the other tenderers are, as this may impact on the competitiveness of the tenders they submit. This may include arrangements in relation to timing, car parking, waiting rooms and signing in books as well as the removal of any materials left by at the interviews by tenderers.
If the pre-tender interviews reveal that one or more prospective candidates are unsuitable, the initial shortlist may be reduced and the remaining candidates invited to tender.
It may also be appropriate to hold mid-tender interviews.
[edit] Related articles on Designing Buildings Wiki
- Best value.
- Construction contract.
- Contract documents.
- How to prepare tender documents.
- Mid-tender interviews.
- Pre-qualification questionnaire.
- Procurement route.
- Tender.
- Tender documents
- Tender negotiations.
- Tender settlement meeting.
[edit] External references
- PACE Guidance on the Appointment of Contractors and Consultants p 481 (for contractors) and p303 (for consultants).
- OGC Tendering process for consultancy support.
Featured articles and news
What they are, how they work and why they are popular in many countries.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.